On Christmas Eve, Dave, Dennis, Greg and I removed the yellowed styrofoam/insulation tiles from the dropped ceiling in the living area. The difference at the end of the day was noticeable, but the 10 contractor bags full of ceiling tiles pointed to a problem that would become much more significant in the near future: trash.
Friday, December 28, 2007
Day 2: Down Comes the Ceiling
On Christmas Eve, Dave, Dennis, Greg and I removed the yellowed styrofoam/insulation tiles from the dropped ceiling in the living area. The difference at the end of the day was noticeable, but the 10 contractor bags full of ceiling tiles pointed to a problem that would become much more significant in the near future: trash.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment